We are making progress.  Got approval today from L&I for our power pedestal, so can move forward with getting power installed.  Talked to Avista (the power company here) and they are just waiting for a signature on a power line easement, and then can install the underground power line.

Got approval today from the local health district for our septic test holes, so as soon as we can design plans drawn, we can submit those for approval.  Will get the design drawn this week and submitted.

The base is down for the shop, and all compacted.  Just waiting for the contractor to finalize his bid and start construction!